01 General

G1.0.00 - Cover Sheet

G1.0.01 - Architectural Symbols, Abbreviations, and General Notes

G1.0.02 - Index Of Drawing

G1.0.03 - Index Of Drawing

G1.1.00 - First Floor Overall Code Plan

G1.1.01 - First Floor Overall Code Plan - Buildings 1, 2, & 3

G1.1.02 - First Floor Overall Code Plan - Buildings 4, 7, & 8 - Base Bid and Alt. Bid #X

G1.1.03 - First Floor Code Plan - Buildings 5, 6, & 9 - Base Bid and Alt. Bid #1

G1.2.00 - Second Floor Overall Code Plan

G1.2.01 - Second Floor Code Plan - Buildings 1, 2, & 3

G1.2.02 - Second Floor Code Plan - Buildings 4, 7, & 8 - Base Bid and Alt. Bid #X

G1.2.03 - Second Floor Code Plan - Buildings 5, 6, & 9 - Base Bid and Alt. Bid #X

G1.3.01 - Best Area of Refuge Floor Plan

 

 

 

02 Civil

BPT-10 r1

 BPT-10  

C1.00 - Existing Conditions Plan

C1.01 - Overall Site Plan

C1.02 - Site Plan - East Half

C1.03 - Site Plan - West Half

C1.04 - Site Plan - Baseball and Softball Fields

C1.05 - Grading Plan - East Half

C1.06 - Drainage Plan - East Half

C1.07 - Grading and Drainage Plan - West Half

C1.08 - Utility Plan

C1.09 - Erosion Control Plan

C1.10 - Erosion Control Details

C1.11 - Jointing Plan - East Half

C1.12 - Details

C1.13 - Details

C1.14 - Details

C1.15 - Details

C1.16 - Details

Details about Drainage Pipe

 

 

02_Specifications

00 00 00 - Bidders Checklist

00 00 00 - Cover Sheet

00 00 00 - McCarthy Front Ends

00 00 00 - Seals

00 00 00 - Table of Contents

00 00 00 - Trade Contract

00 01 15 - Schedule of Drawings

00 11 13 - Advertisement for Bids

00 21 13 - Instructions to Bidders

00 21 15 - Supplementary Instructions to Bidders

00 31 32 - Geotechnical Data

00 80 25 - Wage Determination Schedule

01 22 00 - Unit Prices

01 23 00 - Alternates

01 33 00 - Submittal Procedures

01 40 00 - Quality Requirements

01 42 00 - References

01 56 39 - Temporary Tree and Plant Protection

01 60 00 - Product Requirements

01 77 00 - Closeout Procedures

01 78 23 - Operation and Maintenance Data

01 86 01 - General Acoustical Requirements

03 12 30 - Tiered Concrete Riser Forming

03 30 00 - Cast-In-Place Concrete

03 41 00 - Precast Structural Concrete

04 20 00 - Unit Masonry

04 23 00 - Glass Unit Masonry

04 72 00 - Cast Stone Masonry

05 12 00 - Structural Steel Framing

05 21 00 - Steel Joist Framing

05 31 00 - Steel Decking

05 40 00 - Cold Formed Metal Framing

05 50 00 - Metal Fabrications

05 51 13 - Metal Pan Stairs

05 52 13 - Pipe and Tube Railings

05 71 13 - Fabricated Metal Spiral Stairs

06 10 00 - Rough Carpentry

06 16 00 - Sheathing

06 40 23 - Interior Architectural Woodwork

06 41 16 - Plastic-Laminate-Faced Architectural Cabinets and Countertops

06 42 16 - Flush Wood Paneling

06 64 00 - Plastic Paneling (RFP)

07 13 26 - Self-Adhering Sheet Waterproofing

07 21 00 - Thermal Insulation

07 24 13 - Polymer-Based Exterior Insulation and Finish Systems (EIFS)

07 24 19 - Water-Drainage Exterior Insulation and Finish System (EIFS)

07 25 00 - Weather Barriers

07 26 00 - Vapor Retarders

07 27 26 - Fluid-Applied Membrane Air Barriers

07 42 13.13 - Formed Metal Wall Panels

07 42 13.53 - Metal Soffit Panels

07 42 43.15 - Metal Composite Material Wall Panels

07 54 23 - Thermoplastic Polyolefin (TPO) Roofing

07 62 00 - Sheet Metal Flashing and Trim

07 71 00 - Roof Specialties

07 71 23.13 - Manufactured Downspout Adapters

07 72 00 - Roof Accessories

07 72 37 - Acoustically Rated Smoke and Heat Vents

07 84 13 - Penetration Firestopping

07 84 46 - Fire-Resistive Joint Systems

07 92 00 - Joint Sealants

07 92 18 - Acoustical Sealants

07 95 00 - Expansion Control

08 11 13 - Hollow Metal Doors and Frames

08 14 16 - Flush Wood Doors

08 31 13 - Access Doors and Frames

08 33 13 - Coiling Counter Doors

08 33 23 - Overhead Coiling Doors

08 36 13 - Sectional Doors

08 41 13 - Aluminum-Framed Entrances and Storefronts

08 44 13 - Glazed Aluminum Curtain Wall

08 45 23 - Fiberglass-Sandwich-Panel Assemblies

08 51 13 - Aluminum Windows

08 62 00 - Unit Skylights

08 71 00 - Finish Hardware

08 71 13 - Automatic Door Operators

08 80 00 - Glazing

08 83 00 - Mirrors

08 91 19 - Fixed Louvers

09 21 16 - Gypsum Board Shaft Wall Assemblies

09 22 16 - Non-Structural Metal Framing

09 29 00 - Gypsum Board

09 30 00 - Tiling

09 51 13 - Acoustical Panel Ceilings

09 64 00 - Wood Stage Flooring

09 64 66 - Wood Athletic Flooring

09 65 13 - Resilient Base and Accessories

09 65 19 - Resilient Tile Flooring

09 65 66 - Resilient Athletic Flooring

09 66 23 - Resinous Matrix Terrazzo Flooring

09 67 23 - Resinous Flooring

09 68 13 - Tile Carpeting

09 72 00 - Wall Coverings

09 84 13 - Fixed Sound Absorptive Panels

09 84 33 - Sound-Control Ceiling Units

09 91 13 - Exterior Painting

09 91 23 - Interior Painting

09 96 00 - High-Performance Coatings

09 96 46 - Intumescent Painting

10 11 00 - Visual Display Units

10 14 16 - Plaques

10 14 19 - Dimensional Letter Signage

10 21 13 - Toilet Compartments

10 21 16 - Cast Polymer (Cultured Marble) Shower Compartments

10 21 23 - Cubicle Curtains and Track

10 26 00 - Wall and Door Protection

10 28 00 - Toilet, Bath and Laundry Accessories

10 44 13 - Fire Protection Cabinets

10 44 16 - Fire Extinguishers

10 51 13 - Metal Lockers

10 75 16 - Ground-Set Flagpoles

11 40 00 - Food Service Equipment

11 52 13 - Projection Screens

11 53 13 - Laboratory Fume Hoods

11 61 23 - Platform Systems

11 61 33 - Rigging, Curtain & Tracks

11 61 34 - Theatrical Luninaries and Accessories

11 66 23 - Gymnasium Equipment

11 66 23.43 - Toe Boards

11 66 23.63 - Long Jump and Triple Jump Take Off Board Systems

11 66 23.73 - Discus Cage

11 66 53 - Gymnasium Dividers

11 68 33.13 - Football Goals

12 35 53 - Wood Laboratory Casework

12 36 61 - Simulated Stone Countertops and Window Stools

12 61 00 - Grandstand-Pressbox

12 61 23 - Fixed Audience Seating

12 66 00 - Telescoping Stands

13 08 50 - Acoustically-Rated Door Assemblies

13 34 19 - Metal Building Systems

13 48 20 - Architectural Acoustic Isolation

14 21 00 - Electric Traction Elevators

14 42 00 - Wheelchair Lifts

21 05 00 - Common Work Results for Fire Suppression

21 11 00 - Facility Fire-Suppression Water-Service Piping

21 11 00R -  Facility Fire-Suppression Water-Service Piping

21 13 13 - Wet-Pipe Sprinkler Systems.pdf

22 05 00 - Common Work Results for Plumbing

22 05 13 - Common Motor Requirements for Plumbing Equipment

22 05 16 - Expansion Fittings and Loops for Plumbing Piping

22 05 19 - Meters and Gages for Plumbing Piping

22 05 23 - General-Duty Valves for Plumbing Piping

22 05 29 - Hangers and Supports for Plumbing Piping and Equipment

22 05 48 - Noise and Vibration Control for Plumbing Systems

22 05 53 - Identification for Plumbing Piping and Equipment

22 07 00 - Plumbing Insulation

22 11 13 - Facility Water Distribution Pipe

22 11 16 - Domestic Water Piping

22 11 19 - Domestic Water Piping Specialties

22 13 13 - Facility Sanitary Sewers

22 13 16 - Sanitary Waste and Vent Piping

22 13 19 - Sanitary Waste Piping Specialties

22 14 13 - Storm Drainage Piping

22 14 23 - Storm Drainage Piping Specialties

22 14 29 - Sump Pumps.pdf

22 15 13 - General-Service Compressed-Air Piping

22 15 19 - Packaged Air Compressor and Receivers

22 16 13 - Natural-Gas Piping

22 33 00 - Electric Domestic Water Heaters

22 34 00 - Fuel-Fired Domestic Water Heaters

22 40 00 - Plumbing Fixtures

22 45 00 - Emergency Plumbing Fixtures

22 47 00 - Drinking Fountains and Water Coolers

23 05 00 - Common Work Results for HVAC

23 05 13 - Common Motor Requirements for HVAC Equipment

23 05 19 - Meters and Gages for HVAC Piping

23 05 23 - General-Duty Valves for HVAC Piping

23 05 29 - Hangers and Supports for HVAC Piping and Equipment

23 05 48 - Noise and Vibration Control for HVAC Systems

23 05 49 - Sound Pressure Level-Sound Power Level Limits

23 05 53 - Identification for HVAC Piping and Equipment

23 05 93 - Testing, Adjusting and Balancing for HVAC

23 07 00 - HVAC Insulation

23 08 00 - Commissioning of HVAC

23 08 50 - Refrigerant Detection and Alarm

23 09 00 - Instrumentation and Control for HVAC

23 09 93 - Sequence of Operations for HVAC Controls

23 21 13 - Hydronic Piping

23 21 23 - Hydronic Pumps

23 23 00 - Refrigerant Piping

23 25 00 - HVAC Water Treatment

23 31 13 - Metal Ducts

23 33 00 - Air Duct Accessories

23 34 23 - HVAC Power Ventilators

23 36 00 - Air Terminal Units

23 37 13 - Air Inlets and Outlets

23 37 23 - HVAC Gravity Ventilators

23 52 16 - Condensing Boilers

23 55 33 - Fuel Fired Heaters

23 64 26 - Rotary-Screw Water Chillers

23 73 13 - Modular Indoor Central-Station Air-Handling Units

23 74 13 - Packages, Outdoor, Central-Station Air-Handling Units

23 81 26 - Split-System Air-Conditioners

23 82 33 - Fin Tube Convectors

23 82 38 - Electric Unit Heaters

23 82 39 - Unit Heaters

26 05 00 - Common Work Results for Electrical

26 05 01 - Theatrical Systems Electrical Installation

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

26 05 23 - Control-Voltage Electrical Power Cables

26 05 26 - Grounding and Bonding for Electrical Systems

26 05 29 - Hangers and Support for Electrical Systems

26 05 33 - Raceway and Boxes for Electrical Systems

26 05 48 - Noise and Vibration Control for Electrical Devices

26 09 23 - Lighting Control Devices

26 09 61 - Theatre Stage Lighting System

26 22 00 - Low-Voltage Transformers

26 24 13 - Switchboards

26 24 16 - Panelboards

26 24 19 - Motor-Control Centers

26 27 26 - Wiring Devices

26 28 13 - Fuses

26 28 16 - Enclosed Switches and Circuit Breakers

26 29 13 - Enclosed Controllers

26 32 13 - Engine Generators

26 36 00 - Transfer Switches

26 51 00 - Interior Lighting

26 51 10 - Auditorium Lighting and Fixtures, Lamps & Ballasts

26 56 00 - Exterior Lighting

26 56 68 - Exterior Athletic Lighting

27 05 00 - Common Work Results for Communications

27 11 00 - Communications Equipment Room Fittings

27 51 17 - Rescue Assistance Signal System

28 05 00 - Common Work Results for Electrical Safety and Security

28 05 13 - Conductors and Cables for Electronic Safety and Security

28 31 11 - Fire Alarm

31 10 00 - Site Clearing

31 20 00 - Earth Moving

31 23 19 - Dewatering

31 25 00 - Temporary Erosion Control

31 32 13.19 - Code L Soil Stabilization

32 12 16 - Asphalt Paving

32 13 13 - Concrete Paving

32 13 73 - Concrete Paving Joint Sealants

32 18 16.13 - Playground Protective Surfacing

32 18 23 - Athletic Track Pavement Surfacing

32 18 23.39 - Track & Field Surfacing, Line Markings

32 18 33 - Infield and Warning Track

32 31 13 - Chain Link Fences and Gates

32 31 19 - Decorative Metal Fences and Gates

32 92 00 - Turf and Grasses

32 93 00 - Plants

33 41 00 - Storm Utility Drainage Piping

34 91 00 - Nylon Fiber Reinforced Concrete

Mt Vernon Spec Rebid - Volume 1

Mt Vernon Spec Rebid - Volume 2

Mt Vernon Spec Rebid - Volume 3

 

 

 

 

 

03 Landscape

L1.01 - Overall Landscape Plan - East

L1.02 - Overall Landscape Plan - West

L1.03 - Enlarged Landscape Plans

L1.04 - Enlarged Landscape Plan and Details

 

 

 

 

 

 

 

 

 

 

04 Architectural Site

AS0.0.01 - Overall Architectural Site Plan

AS1.1.01 - Enlarged Architectural Site Plans - East Entry Plazas

AS1.1.02 - Enlarged Architectural Site Plans - Sports Plaza and Courtyards

AS1.1.03 - Enlarged Architectural Site Plans

AS1.1.04 - Enlarged Architectural Site Plans - Stadium Plaza and Alternates

AS1.1.04 - Enlarged Architectural Site Plans - Stadium Plaza and Alternates

AS1.1.05 - Enlarged Architectural Site Plans and Details 

AS1.1.06 - Enlarged Architectural Site Plans - Stadium Bleachers - Add Alt. Bid 7

AS1.1.07 - Architectural Site Details - Visitor Bleachers and Press Box - Add Alt. Bid 7

AS1.1.08 - Enlarged Architectural Site Plans - Grandstand - Add Alt. Bid 7

AS1.1.09 - Architectural Site Sections and Details - Grand Stand - Add Alt. Bid 7

AS1.1.10 - Architectural Site Details - Guardrail and Handrail Details

AS1.1.11 - Architectural Site Details - Monument and Marquee Signs

AS1.1.12 - Architectural Site Details - Screens-Fencing - Base Bid and Deduct Alt. 3

AS1.1.13 - Architectural Site Details - Gates and Guardrails

AS1.1.14 - Architectural Site Details - Base Bid and Deduct Alt. 3

 

05 Architectural

A1.1.01 - First Floor Note Plan - Enlarged Area 'A'

A1.1.02 - First Floor Note Plan - Enlarged Area 'B1'

A1.1.03 - First Floor Note Plan - Enlarged Area 'B2'

A1.1.04 - First Floor Note Plan - Enlarged Area 'D1'

A1.1.05 - First Floor Note Plan - Enlarged Area 'D2'

A1.1.06 - First Floor Note Plan - Enlarged Area 'F1'

A1.1.07 - First Floor Note Plan - Enlarged Area 'F2'

A1.1.08 - First Floor Note Plan - Enlarged Area 'E1'

A1.1.09 - First Floor Note Plan - Enlarged Area 'E2' - Base Bid

A1.1.10 - First Floor Note Plan - Enlarged Area 'E3' - Deduct Alt. Bid #1

A1.1.11 - First Floor Note Plan - Enlarged Area 'C1'

A1.1.12 - First Floor Note Plan - Enlarged Area 'C2'

A1.1.13 - First Floor Note Plan - Enlarged Area 'G1'

A1.1.14 - First Floor Note Plan - Enlarged Area 'G2' - Base Bid

A1.1.15 - First Floor Note Plan - Enlarged Area 'G2' - Add Alt. Bid #1

A1.2.00 - Overall Second Floor Plan

A1.2.01 - Second Floor Note Plan - Enlarged Area 'A'

A1.2.02 - Second Floor Note Plan - Enlarged Area 'B1'

A1.2.03 - Second Floor Note Plan - Enlarged Area 'B2'

A1.2.04 - Second Floor Note Plan - Enlarged Area 'D1'

A1.2.05 - Second Floor Note Plan - Enlarged Area 'D2'

A1.2.06 - Second Floor Note Plan - Enlarged Area 'F1'

A1.2.11 - Second Floor Note Plan - Enlarged Area 'C1'

A1.2.12 - Second Floor Note Plan - Enlarged Area 'C2'

A1.2.15 - Aud. Control Room, Tech, Mezz, & Catwalk Plans 'G2' - Add Alt. Bid #1

A1.3.00 - Overall Building Arc Dimension Plan

A1.3.01 - First Floor Dimension Plan - Enlarged Area 'A'

A1.3.02 - First Floor Dimension Plan - Enlarged Area 'B1'

A1.3.03 - First Floor Dimension Plan - Enlarged Area 'B2'

A1.3.04 - First Floor Dimension Plan - Enlarged Area 'D1'

A1.3.05 - First Floor Dimension Plan - Enlarged Area 'D2'

A1.3.06 - First Floor Dimension Plan - Enlarged Area 'F1'

A1.3.07 - First Floor Dimension Plan - Enlarged Area 'F2'

A1.3.08 - First Floor Dimension Plan - Enlarged Area 'E1'

A1.3.09 - First Floor Dimension Plan - Enlarged Area 'E2' - Base Bid

A1.3.10 - First Floor Dimension Plan - Enlarged Area 'E3' - Deduct Alt. Bid #1

A1.3.11 - First Floor Dimension Plan - Enlarged Area 'C1'

A1.3.12 - First Floor Dimension Plan - Enlarged Area 'C2'

A1.3.13 - First Floor Dimension Plan - Enlarged Area 'G1'

A1.3.14 - First Floor Dimension Plan - Enlarged Area 'G2' - Base Bid

A1.3.15 - First Floor Dimension Plan - Enlarged Area 'G2' - Add Alt. Bid #1

A1.4.01 - Second Floor Dimension Plan - Enlarged Area 'A'

A1.4.02 - Second Floor Dimension Plan - Enlarged Area 'B1'

A1.4.03 - Second Floor Dimension Plan - Enlarged Area 'B2'

A1.4.04 - Second Floor Dimension Plan - Enlarged Area 'D1'

A1.4.05 - Second Floor Dimension Plan - Enlarged Area 'D2'

A1.4.06 - Second Floor Dimension Plan - Enlarged Area 'F1'

A1.4.11 - Second Floor Dimension Plan - Enlarged Area 'C1'

A1.4.12 - Second Floor Dimension Plan - Enlarged Area 'C2'

A1.5.00 - Overall Roof Plan

A1.5.01 - Roof Plan - Enlarged Area 'A'

A1.5.02 - Roof Plan - Enlarged Area 'B1'

A1.5.03 - Roof Plan - Enlarged Area 'B2'

A1.5.04 - Roof Plan - Enlarged Area 'D1'

A1.5.05 - Roof Plan - Enlarged Area 'D2'

A1.5.06 - Roof Plan - Enlarged Area 'F1'

A1.5.07 - Roof Plan - Enlarged Area 'F2'

A1.5.08 - Roof Plan - Enlarged Area 'E1'

A1.5.09 - Roof Plan - Enlarged Area 'E2' - BASE BID

A1.5.10 - Roof Plan - Enlarged Area 'E3' - DEDUCT ALT. BID #1

A1.5.11 - Roof Plan - Enlarged Area 'C1'

A1.5.12 - Roof Plan - Enlarged Area 'C2'

A1.5.13 - Roof Plan - Enlarged Area 'G1'

A1.5.14 - Roof Plan - Enlarged Area 'G2' - Base Bid

A1.5.20 - Roof Details

A1.5.21 - Roof Details

A1.5.22 - Roof Details

A1.5.30 - Roof Ladder Details

A1.5.31 - Roof Ladder Details

A1.5.32 - Roof Ladder Details

A1.6.08 - Clerestory Plan - Enlarged Area 'E1'

A1.6.09 - Clerestory Plan - Enlarged Area 'E2' - Base Bid

A2.1.01 - Room Finish Schedule

A2.1.02 - Room Finish Schedule

A2.1.03 - Room Finish Schedule

A2.1.04 - Room Finish Schedule

A2.2.01 - Partition Types

A2.2.02 - Partition Types

A2.2.03 - Partition Types

A2.2.04 - Partition Types

A2.2.05 - Wall Penetration Details

A2.2.06 - Miscellaneous Framing Details

A2.3.01 - Door and Frame Schedules - Area 'A'

A2.3.02 - Door and Frame Schedules - Areas 'B' & 'D'

A2.3.03 - Door and Frame Schedules - Areas 'E' & 'F'

A2.3.04 - Door and Frame Schedules - Areas 'C' & 'G'

A2.3.10 - Door and Frame Types, Borrow Lite Types, & Interior Window Types

A2.3.20 - Door Details

A2.3.21 - Door Details

A2.3.22 - Door Details

A2.3.23 - Door Details

A2.3.24 - Door Details

A2.3.25 - Borrow-Lite Details

A2.5.01 - Mounting Heights

A3.0.00 - Overall Exterior Building Elevations

A3.1.00 - Partial Building Elevations

A3.1.01 - Partial Building Elevations

A3.1.02 - Partial & Enlarged Building Elevations

A3.1.03 - Partial & Enlarged Building Elevations

A3.1.10 - Partial Building Elevations

A3.1.11 - Partial Building Elevations

A3.1.12 - Partial Building Elevations

A3.1.13 - Partial Building Elevations

A3.1.20 - Partial Building Elevations & Enlarged Elevations

A3.1.21 - Partial Building Elevations

A3.1.22 - Partial Building Elevations

A3.1.23 - Partial Building Elevations

A3.1.30 - Partial Building Elevations

A3.1.31 - Partial Building Elevations - Add Alt. Bid #1

A3.1.32 - Partial Building Elevations - Base Bid and Add Alt. Bid #1

A3.1.33 - Partial Building Elevations - Base Bid and Add Alt. Bid #1

A3.1.34 - Partial Building Elevations

A3.2.00 - Building Sections

A3.2.01 - Building Sections

A3.2.10 - Building Sections

A3.2.11 - Building Sections

A3.2.12 - Building Sections

A3.2.20 - Building Sections

A3.2.21 - Building Sections

A3.2.22 - Building Sections

A3.2.30 - Building Sections - Add Alt. Bid #1

A3.2.31 - Building Sections - Base Bid and Add Alt. Bid #1

A3.2.32 - Building Sections - Base Bid and Add Alt. Bid #1

A3.3.00 - Wall Sections - Typical and Fire Wall

A3.3.01 - Wall Sections - Over Hang at Freshman Academy

A3.3.02 - Wall Sections - Entrance to Freshman Academy

A3.3.03 - Wall Sections - At Spine

A3.3.04 - Wall Sections - Lobby

A3.3.05 - Wall Sections - Typical West Side

A3.3.06 - Wall Sections - Typical 'X' Bracing

A3.3.07 - Wall Sections - Front Facade

A3.3.08 - Wall Sections - Miscellaneous

A3.3.10 - Wall Section - Fire Wall

A3.3.11 - Wall Sections - Corridor

A3.3.12 - Wall Sections - Typical Classroom

A3.3.13 - Wall Sections - Corridor Ends

A3.3.14 - Wall Sections - Corridor Ends

A3.3.15 - Wall Sections - Stairwell

A3.3.17 - Wall Sections - CTE

A3.3.18 - Wall Sections - CTE

A3.3.19 - Wall Sections - CTE

A3.3.20 - Wall Sections - CTE

A3.3.21 - Wall Sections - CTE

A3.3.22 - Wall Sections - CTE

A3.3.23 - Wall Sections - CTE Expansion Joint

A3.3.30 - Wall Sections - Sports Lobby

A3.3.31 - Wall Sections - Sports Lobby - Athletics West

A3.3.32 - Wall Sections - Athletics West Ext.

A3.3.33 - Wall Sections - Gymnasium Upper Walls

A3.3.34 - Wall Sections - Gymnasium Upper Walls

A3.3.35 - Wall Sections - Miscellaneous South Walls

A3.3.36 - Wall Sections - Turf Room (Base Bid)

A3.3.37 - Wall Sections - Mech. Area

A3.3.38 - Wall Sections - Cafeteria

A3.3.39 - Wall Sections - Interior and Miscellaneous

A3.3.40 - Wall Sections - Entries and Misc.

A3.3.41 - Wall Sections - Media Center

A3.3.42 - Wall Sections - Media Center

A3.3.43 - Wall Sections - 2nd Floor

A3.3.44 - Wall Sections - Fire Wall & Details

A3.3.45 - Wall Sections - Deduct Alt. #1

A3.3.70 - Wall Sections - West Side Typ.

A3.3.71 - Wall Sections - Band & Choral Room

A3.3.72 - Wall Sections - Band & Choral Room Cont.

A3.3.73 - Wall Sections - Base Bid (No Auditorium)

A3.3.74 - Wall Sections - North Side - Add Alt. Bid #1

A3.3.75 - Wall Sections - Misc. Base Bid Walls

A3.3.76 - Wall Sections - Art Rooms

A3.3.77 - Wall Sections - Art Rooms and Entry

A3.3.78 - Wall Sections - Aud. Interior and South - Add Alt. Bid #1

A3.3.79 - Wall Sections - Auditorium South - Add Alt. Bid #1

A3.3.80 - Wall Sections - Stage House North - Add Alt. Bid #1

A3.3.81 - Wall Sections - Stage House East - Add Alt. Bid #1

A3.3.82 - Wall Sections - Stage House at Proscenium - Add Alt. Bid #1

A3.3.83 - Wall Sections - Stage South and West - Add Alt. Bid #1

A3.3.84 - Wall Sections - Aud. West  - Add Alt. Bid #1

A3.3.85 - Wall Sections - Aud. East - Add Alt. Bid #1

A3.4.00 - Typical Exterior and EIFS Details

A3.4.01 - Typical Composite Metal Panel Details

A3.4.05 - Cast Stone Shapes

A3.4.06 - Exterior Cast Stone Column Details

A3.4.07 - Exterior EIFS Entry Header Details

A3.4.10 - Exterior Wall Details

A3.4.11 - Exterior Wall Details

A3.4.12 - Exterior Wall Details

A3.4.13 - Exterior Wall Details

A3.4.20 - Exterior Wall Details

A3.4.30 - Exterior Wall Details

A3.4.31 - Exterior Wall Details

A3.4.40 - Exterior Wall Details

A3.4.41 - Exterior Wall Details

A3.5.01 - Exterior Window, Glass Block, Storefront Elevations, and Notes

A3.5.02 - Exterior Curtain Wall Elevations and Notes

A3.5.03 - Interior Curtain Wall and Storefront Elevs, Kalwall Elevs, and Notes

A3.5.04 - Exterior Curved Storefront Elevations. Louver Elevations, and Notes

A3.6.01 - Exterior Window Details

A3.6.05 - Glass Block and Louver Details

A3.6.10 - Exterior Storefront Details

A3.6.11 - Exterior Storefront Details

A3.6.15 - Exterior Curtain Wall Details

A3.6.16 - Exterior Curtain Wall Details

A3.6.20 - Kalwall, Interior Curtain Wall, and Interior Storefront Details

A5.1.01 - Enlarged Floor Plans and Interior Elev. - Museum - Secure Vestibule

A5.1.02 - Interior Elevations - Museum - Secure Vestibule

A5.1.03 - Interior Elevations - Museum - Secure Vestibule

A5.1.04 - Enlarged Floor Plans and Interior Elevations - Administration

A5.1.05 - Enlarged Floor Plans and Interior Elevations - District Admin

A5.1.06 - Enlarged Floor Plans and Interior Elevs. - Guidance - Deans Office

A5.1.07 - Enlarged Floor Plans and Interior Elevations - Fresh. Acad. Admin

A5.1.08 - Enlarged Floor Plans and Interior Elev. - F. Acad. Classroom, Science

A5.1.09 - Interior Elevations Freshman Academy Science

A5.1.10 - Enlarged Plans and Interior Elevations - F. Acad. Extend. Learning

A5.1.11 - Enlarged Floor Plans & Interior Elev. - Presentation Amphitheater

A5.1.12 - Enlarged Floor Plans & Int. Elev. - Construction Lab

A5.1.13 - Enlarged Floor Plans & Interior Elevs. - Arch. & Construct Lab

A5.1.14 - Enlarged Floor Plans & Interior Elevs. - Electronics & Robotics

A5.1.15 - Enlarged Floor Plans & Int. Elevs. - Precision Measure & Manuf. Class

A5.1.16 - Enlarged Floor Plans & Interior Elevs. - AG Classrooms & Prep

A5.1.17 - Enlarged Plans & Int. Elev. - Engine Overhaul & Auto Shop Storage

A5.1.18 - Enlarged Floor Plans & Interior Elevations - Multi-Disp Stem Lab

A5.1.19 - Enlarged Floor Plans & Interior Elevations - Multi-Disp Stem Lab

A5.1.20 - Enlarged Floor Plans & Interior Elevations - Science Lab-Class

A5.1.21 - Enlarged Floor Plans & Interior Elevations - Science Lab-Class

A5.1.22 - Enlarged Floor Plans & Interior Elevations - Health Occupations

A5.1.23 - Enlarged Floor Plans & Interior Elevations - AG Lab

A5.1.24 - Enlarged Floor Plans & Interior Elevations - Machine Shop

A5.1.25 - Enlarged Floor Plans & Interior Elevs. - Manufacturing Lab

A5.1.26 - Enlarged Floor Plans & Interior Elevations - Auto Shop Lab

A5.1.27 - Enlarged Floor Plans & Interior Elevations - Bio-Tech Lab

A5.1.28 - Enlarged Floor Plans & Elevations - CNA Lab & Typ. Classroom

A5.1.29 - Interior Elevations - Corridor

A5.1.30 - Enlarged Floor Plans & Int. Elevs. - Sports Lobby

A5.1.31 - Enlarged Floor Plans - Media Center

A5.1.32 - Enlarged Floor Plans - Cafeteria

A5.1.33 - Enlarged Floor Plans - Cafeteria

A5.1.34 - Enlarged Floor Plans and Interior Elevations - Cafeteria

A5.1.35 - Enlarged Floor Plans and Interior Elevations - Cafeteria

A5.1.36 - Enlarged Floor Plans and Details - Competition Gym

A5.1.37 - Interior Elevations - Competition Gym

A5.1.38 - Interior Elevations - Competition Gym

A5.1.39 - Enlarged Floor Plans and Interior Elevations - Weight Room

A5.1.40 - Enlarged Floor Plans & Int. Elev's - Concessions, Laundry, Trainer

A5.1.41 - Enlarged Floor Plans and Interior Elevations - Auxillary Gym

A5.1.42 - Enlarged Floor Plans  and Interior Elev's - Study Hall & Aux. Gym

A5.1.43 - Enlarged Floor Plans and Int. Elevations - Boy's Locker Room

A5.1.44 - Enlarged Fl. Plans and Interior Elev.s  - Toilets-Coaches Lckrs Rms

A5.1.45 - Enlarged Floor Plans and Interior Elev's - Girls' Locker Rooms

A5.1.46 - Enlarged Floor Plans and Interior Elevations - Toilets

A5.1.47 - Enlarged Floor Plans and Interior Elevations - Toilets

A5.1.49 - Enlarged Floor Plans & Interior Elevations - Auditorium Lobby

A5.1.50 - Enlarged Floor Plans - Auditorium PLAN - Add Alt. Bid 1

A5.1.51 - Interior Elevations - Auditorium - Add Alt. Bid 1

A5.1.52 - Interior Elevations - Auditorium - Add Alt. Bid 1

A5.1.53 - Enlarged Floor Plans & Interior Elevations - Band Room

A5.1.55 - Enlarged Floor Plans & Interior Elevations - Choral-Orchestra

A5.1.56 - Enlarged Floor Plans & Interior Elevations - Art Rooms

A5.1.57 - Enlarged Floor Plans and Interior Elevations - Art - Ceramics

A5.1.58 - Enlarged Floor Plans & Interior Elevations - Foods Lab

A5.1.59 - Enlarged Floor Plans & Interior Elevations - Human Services

A5.1.60 - Enlarged Floor Plans & Interior Elevations - Stage  - Add Alt. Bid 1

A5.1.61 - Interior Elevations - Stage - Add Alt. Bid 1

A5.1.62 - Enlarged Floor Plans & Interior Elevations - 2nd Floor Spaces

A5.1.64 - Enlarged Floor Plans & Interior Elevations - Child & Life Skills

A5.1.65 - Enlarged Floor Plans & Int. Elev. - Dressing Rooms - Add Alt. Bid 1

A5.1.66 - Enlarged Floor Plans - Auditorium Support Spaces - Add Alt. Bid 1

A5.1.67 - Enlarged Floor Plans and Interior Elevations - Toilets

A5.1.68 - Enlarged Floor Plans and Interior Elevations - Toilets

A5.1.69 - Enlarged Floor Plans & Interior Elevations - Toilets

A5.1.70 - Enlarged Floor Plans & Interior Elevations - Toilets

A5.1.71 - Enlarged Floor Plans & Interior Elevations - Toilets

A5.1.74 - Enlarged Floor Plans & Interior Elevations - Early Child. Toilets

A5.1.75 - Enlarged Floor Plans & Interior Elevations - Toilets

A5.2.01 - Enlarged Firewall Details

A5.2.02 - Enlarged Firewall Details

A5.2.03 - Enlarged Firewall Details

A5.2.04 - Enlarged Firewall Details

A5.2.05 - Enlarged Firewall Details

A5.3.01 - Typical Casework Types and Millwork Details

A5.3.02 - Typical Casework Types and Millwork Details

A5.3.03 - Typical Casework Types and Millwork Details

A5.3.04 - Typical Casework Types and Details - Media Center

A5.4.01 - Display Case Details

A5.4.03 - Display Case Details

A5.4.04 - Display Case Details

A5.4.05 - Display Case Details

A5.4.06 - Display Case Enlarged Details

A5.5.01 - Horizontal Details

A5.5.02 - Horizontal Details

A5.5.03 - Horizontal Details

A5.5.04 - Horizontal Details

A5.5.05 - Horizontal Details

A5.5.06 - Horizontal Details

A5.5.07 - Horizontal Details

A5.5.08 - Horizontal Details

A5.5.09 - Horizontal Details

A5.5.11 - Horizontal Details

A5.5.12 - Horizontal Details

A5.5.13 - Horizontal Details

A5.5.14 - Horizontal Details

A5.5.15 - Horizontal Details

A5.5.16 - Horizontal Details

A5.6.01 - Miscellaneous Details - Auditorium - Add Alt. Bid #1 and #3

A5.6.02 - Misc. Details - Aud. Lobby and Aud. - Base Bid and Add Alt. Bid #1

A5.6.03 - Miscellaneous Details - Aud. Catwalks - Add Alt. Bid #1, 2, 3, 4, 5 & 6

A5.6.04 - Miscellaneous Details - Stage Flooring and Specialties - Add Alt. Bid #3

A5.6.05 - Miscellaneous Details - Auditorium Clouds - Add Alt. Bid #2

A5.6.06 - Miscellaneous Details - Auditorium Clouds - Add Alt. Bid #2

A5.6.07 - Misc. Details- AUD. - Lighting and Veneer Elev. - Add Alt. Bid #3 AND #6

A5.6.08 - Misc. Details- Auditorium Woodwork and Case Work - Add Alt. Bid #3

A5.7.01 - Locker Details

A6.1.00 - Overall First Floor Reflected Ceiling Plan

A6.1.01 - First Floor Reflected Ceiling Plan - Enlarged Area 'A'

A6.1.02 - First Floor Reflected Ceiling Plan - Enlarged Area 'B1'

A6.1.03 - First Floor Reflected Ceiling Plan - Enlarged Area 'B2'

A6.1.04 - First Floor Reflected Ceiling Plan - Enlarged Area 'D1'

A6.1.05 - First Floor Reflected Ceiling Plan - Enlarged Area 'D2'

A6.1.06 - First Floor Reflected Ceiling Plan - Enlarged Area 'F1'

A6.1.07 - First Floor Reflected Ceiling Plan - Enlarged Area 'F2'

A6.1.08 - First Floor Reflected Ceiling Plan - Enlarged Area 'E1'

A6.1.09 - First Floor Reflected Ceiling Plan - Enlarged Area 'E2' - Base Bid

A6.1.10 - First Floor Reflected Ceiling Plan - Enlarged Area 'E3' - Deduct Alt. Bid #1

A6.1.11 - First Floor Reflected Ceiling Plan - Enlarged Area 'C1'

A6.1.12 - First Floor Reflected Ceiling Plan - Enlarged Area 'C2'

A6.1.13 - First Floor Reflected Ceiling Plan - Enlarged Area 'G1'

A6.1.14 - First Floor Reflected Ceiling Plan - Enlarged Area 'G2' - Base Bid

A6.1.15 - First Floor Reflected Ceiling Plan - Enlarged Area 'G2' - Add Alt. Bid #2

A6.1.15A - Followspot Booth R.C.P. 'G2' - Add Alt. Bid #2

A6.2.00 - Overall Second Floor Reflected Ceiling Plan

A6.2.01 - Second Floor Reflected Ceiling Plan - Enlarged Area 'A'

A6.2.02 - Second Floor Reflected Ceiling Plan - Enlarged Area 'B1'

A6.2.03 - Second Floor Reflected Ceiling Plan - Enlarged Area 'B2'

A6.2.04 - Second Floor Reflected Ceiling Plan - Enlarged Area 'D1'

A6.2.06 - Second Floor Reflected Ceiling Plan - Enlarged Area 'F'

A6.2.11 - Second Floor Reflected Ceiling Plan - Enlarged Area 'C1'

A6.2.12 - Second Floor Reflected Ceiling Plan - Enlarged Area 'C2'

A6.2.15 - Second Floor R.C.P.  - Enlarged Area 'G2' - Add Alt. Bid #2

A6.5.01 - Ceiling Details

A6.5.02 - Ceiling Details

A6.5.03 - Ceiling Details

A7.1.01 - Vertical Circulation Plans

A7.1.10 - Vertical Circulation Plans

A7.1.11 - Vertical Circulation Plans

A7.1.20 - Vertical Circulation Plans

A7.1.30 - Vertical Circulation Plans

A7.1.31 - Vertical Circulation Plans and Details - Add Alt. Bid #1

A7.2.01 - Vertical Circulation Sections and Details 

A7.2.02 - Vertical Circulation Sections and Details

A7.2.03 - Vertical Circulation Sections

A7.2.10 - Vertical Circulation Sections and Details

A7.2.11 - Vertical Circulation Sections and Details

A7.2.12 - Vertical Circulation Sections and Details

A7.2.14 - Vertical Circulation Sections and Details

A7.2.20 - Vertical Circulation Sections and Details

A7.2.30 - Vertical Circulation Sections and Details - Add Alt. Bid #1

A7.2.31 - Vertical Circulation Sections - Add Alt. Bid #1

A7.3.01 - Vertical Circulation Details

A7.3.02 - Vertical Circulation Details

A8.1.00 - Overall Finish Floor Plan - First Floor

A8.1.01 - First Floor Finish Plan - Enlarged Area 'A'

A8.1.02 - First Floor Finish Plan - Enlarged Area 'B1'

A8.1.03 - First Floor Finish Plan - Enlarged Area 'B2'

A8.1.04 - First Floor Finish Plan - Enlarged Area 'D1'

A8.1.05 - First Floor Finish Plan - Enlarged Area 'D2'

A8.1.06 - First Floor Finish Plan - Enlarged Area 'F1'

A8.1.07 - First Floor Finish Plan - Enlarged Area 'F2'

A8.1.08 - First Floor Finish Plan - Enlarged Area 'E1'

A8.1.09 - First Floor Finish Plan - Enlarged Area 'E2' - Base Bid

A8.1.10 - First Floor Finish Plan - Enlarged Area 'E3' - Deduct Alt. Bid #1

A8.1.11 - First Floor Finish Plan - Enlarged Area 'C1'

A8.1.12 - First Floor Finish Plan - Enlarged Area 'C2'

A8.1.13 - First Floor Finish Plan - Enlarged Area 'G1'

A8.1.14 - First Floor Finish Plan - Enlarged Area 'G2' - Base Bid

A8.1.15 - First Floor Finish Plan - Enlarged Area 'G3' - Add Alt. Bid #3

A8.2.00 - Overall Finish Floor Plan - Second Floor

A8.2.01 - Second Floor Finish Plan - Enlarged Area 'A'

A8.2.02 - Second Floor Finish Plan - Enlarged Area 'B1'

A8.2.03 - Second Floor Finish Plan - Enlarged Area 'B2'

A8.2.06 - Second Floor Finish Plan - Enlarged Area 'F1'

A8.2.11 - Second Floor Finish Plan - Enlarged Area 'C1'

A8.2.12 - Second Floor Finish Plan - Enlarged Area 'C2'

 

 

 

06 Structural

S1.1.01 - General Notes

S1.2.01 - Typical Details

S1.2.02 - Typical Details

S1.2.03 - Typical Details

S1.2.04 - Typical Details

S1.2.05 - Typical Details

S1.2.06 - Typical Details

S1.2.07 - Typical Details

S2.0.01 - Building 1 Layout Plan

S2.0.02 - Building 2 Layout Plan

S2.0.03 - Building 3 Layout Plan

S2.0.04 - Building 4 Layout Plan- South

S2.0.05 - Building 4 Layout Plan- North

S2.1.01 - Partial First Floor and Foundation Plan - Area A

S2.1.02 - Partial First Floor and Foundation Plan - Area B1

S2.1.03 - Partial First Floor and Foundation Plan - Area B2

S2.1.04 - Partial First Floor and Foundation Plan - Area D1

S2.1.05 - Partial First Floor and Foundation Plan - Area D2

S2.1.06 - Partial First Floor and Foundation Plan - Area F1

S2.1.07 - Partial First Floor and Foundation Plan - Area F2

S2.1.08 - Partial First Floor and Foundation Plan - Area C1

S2.1.09 - Partial First Floor and Foundation Plan - Area C2

S2.1.10 - Partial First Floor and Foundation Plan - Area G1

S2.1.11 - Partial First Floor and Foundation Plan - Area G2

S2.1.12 - Partial First Floor and Foundation Plan - Area G2 - Alt. Bid 1

S2.1.13 - Partial First Floor and Foundation Plan - Area E1

S2.1.14 - Partial First Floor and Foundation Plan - Area E2

S2.1.15 - Partial First Floor and Foundation Plan - Area E3

S2.1.16 - Partial First Floor and Foundation Plan - Area E3 - Deduct Alt. - Bid 1

S2.2.01 - Partial Second Floor Framing Plan - Area A

S2.2.02 - Partial Second Floor Framing Plan - Area B1

S2.2.03 - Partial Second Floor Framing Plan - Area B2

S2.2.04 -  Partial Second Floor-Industrial Art Mezz. Framing Plan - Area D1

S2.2.05 - Partial Second Floor-Industrial Art Mezz. Framing Plan - Area D2

S2.2.06 - Partial Second Floor and Roof Framing Plan - Area F1

S2.2.07 - Partial Cafeteria Low Roof Framing Plan - Area F2

S2.2.08 - Partial Second Floor Framing Plan - Area C1

S2.2.09 - Partial Second Floor Framing Plan - Area C2

S2.2.10 - Partial Second Floor and Roof Framing Plan - Area G1

S2.2.11 - Partial Roof and Mezzanine Framing Plan - Area G2

S2.2.12 - Partial Low Roof Framing Plan - Area G2 - Alt. Bid 1

S2.2.13 - Partial Roof Framing Plan - Area E1

S2.2.14 - Partial Roof Framing Plan - Area E2

S2.2.15 - Partial Roof Framing Plan - Area E3 - and Deduct Alt. - Bid 1

S2.3.01 - Partial Administration Roof Framing Plan - Area A

S2.3.02 - Partial North-South Classroom Roof Framing Plan - Area B1

S2.3.03 - Partial North-South Classroom Roof Framing Plan - Area B2

S2.3.04 - Partial Media Roof Framing Plan - Area F1

S2.3.05 - Partial North-South Classroom Roof Framing Plan - Area C1

S2.3.06 - Partial North-South Classroom Roof Framing Plan - Area C2

S2.3.07 - Partial Choral-Orchestra and Art Roof Framing Plan - Area G1

S2.3.08 - Partial Band Room Roof Framing Plan - Area G2

S2.3.09 - Partial Choral and Band Roof Framing Plan - Area G2 - Alt. Bid 1

S2.3.10 - Partial Turf Roof Framing Plan - Area E3

S2.4.01 - Partial Auditorium and Stage Catwalk Framing Plan - Area G2 - Alt. Bid

S2.4.02 - Partial Auditorium and Stage Roof Framing Plan - Area G2 - Alt. Bid 1

S2.4.03 - Partial Competition Gym Roof Framing Plan - Area E2

S2.4.04 - Partial Gym Roof Framing Plan - Area E2

S3.1.01 - Base Plate and Concrete Column Details

S3.1.02 - Base Plate and Concrete Column Details

S4.1.01 - Foundation Sections

S4.1.02 - Foundation Sections

S4.1.03 - Foundation Sections

S4.1.04 - Foundation Sections

S4.1.05 - Foundation Sections

S4.1.06 - Foundation Sections

S5.1.01 - Floor Sections

S5.1.02 - Floor Sections

S5.1.03 - Floor Sections

S5.1.04 - Floor Sections

S6.1.01 - Roof Sections

S6.1.02 - Roof Sections

S6.1.03 - Roof Sections

S6.1.04 - Roof Sections

S6.1.05 - Roof Sections

S6.1.06 - Roof Sections

S6.1.07 - Roof Sections

S6.1.08 - Roof Sections

S6.1.09 - Roof Sections

S6.1.10 - Roof Sections

S7.1.01 - Vertical Brace Elevations

S7.1.02 - Vertical Brace Elevations

S7.1.03 - Vertical Brace Elevations

S7.1.04 - Vertical Brace Elevations

S7.2.01 - Vertical Brace Elevations

S7.2.02 - Vertical Brace Elevations

S8.1.01 - Truss Elevations

 

 

 

 

07 Mechanical

M1.1.01 - First Floor Ductwork Plan - Area A

M1.1.02 - First Floor Ductwork Plan - Area B1

M1.1.03 - First Floor Ductwork Plan - Area B2

M1.1.04 - First Floor Ductwork Plan - Area D1

M1.1.05 - First Floor Ductwork Plan - Area D2

M1.1.06 - First Floor Ductwork Plan - Area F1

M1.1.07 - First Floor Ductwork Plan - Area F2

M1.1.08 - First Floor Ductwork Plan - Area E1

M1.1.09 - First Floor Ductwork Plan - Area E2

M1.1.11 - First Floor Ductwork Plan - Area C1

M1.1.12 - First Floor Ductwork Plan - Area C2

M1.1.13 - First Floor Ductwork Plan - Area G1

M1.1.14 - First Floor Ductwork Plan - Area G2 - Base Bid

M1.1.15 - First Floor Ductwork Plan - Area G3 - Alternate Bid 1 & 2

M1.2.01 - Second Floor Ductwork Plan - Area A

M1.2.02 - Second Floor Ductwork Plan - Area B1

M1.2.03 - Second Floor Ductwork Plan - Area B2

M1.2.04 - Upper Level Ductwork Plan - Area D1

M1.2.05 - Upper Level Ductwork Plan - Area D2

M1.2.06 - Second Floor Ductwork Plan - Area F1

M1.2.07 - Second Floor Ductwork Plan - Area F2

M1.2.08 - Second Floor Ductwork Plan - Area E1

M1.2.09 - Second Floor Ductwork Plan - Area E2

M1.2.10 - Second Floor Ductwork Plan - Area E3 - Deduct Alternate Bid 1

M1.2.11 - Second Floor Ductwork Plan - Area C1

M1.2.12 - Second Floor Ductwork Plan - Area C2

M1.2.13 - Second Floor Ductwork Plan - Area G1

M1.2.14 - Second Floor Ductwork Plan - Area G2 - Base Bid

M1.2.15 - Second Floor Ductwork Plan - Area G3 - Alternate Bid 1, 2 & 3

M2.1.01 - First Floor Piping Plan - Area A

M2.1.02 - First Floor Piping Plan - Area B1

M2.1.03 - First Floor Piping Plan - Area B2

M2.1.04 - First Floor Piping Plan - Area D1

M2.1.05 - First Floor Piping Plan - Area D2

M2.1.06 - First Floor Piping Plan - Area F1

M2.1.08 - First Floor Piping Plan - Area E1

M2.1.09 - First Floor Piping Plan - Area E2

M2.1.11 - First Floor Piping Plan - Area C1

M2.1.12 - First Floor Piping Plan - Area C2

M2.1.13 - First Floor Piping Plan - Area G1

M2.1.14 - First Floor Piping Plan - Area G2 - Base Bid

M2.1.15 - First Floor Piping Plan - Area G3 - Alternate Bid 1

M2.2.01 - Second Floor Piping Plan - Area A

M2.2.02 - Second Floor Piping Plan - Area B1

M2.2.03 - Second Floor Piping Plan - Area B2

M2.2.04 - Upper Level Piping Plan - Area D1

M2.2.05 - Upper Level Piping Plan - Area D2

M2.2.11 - Second Floor Piping Plan - Area C1

M2.2.12 - Second Floor Piping Plan - Area C2

M3.1.01 - Large Scale Mechanical Room Plan - Area A

M3.1.02 - Large Scale Mechanical Room Plan - Area B1

M3.1.03 - Large Scale Mechanical Room Plan - Area F

M3.1.04 - Sections - Mechanical

M4.1.01 - Details - Mechanical

M4.1.02 - Details - Mechanical

M5.1.01 - Symbols and Schedules - Mechanical

M5.1.02 - Schedules - Mechanical

M5.1.03 - Schedules - Mechanical

M5.1.04 - Schedules - Mechanical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

09 Plumbing

P1.0.01 - Foundation Plumbing Plan - Enlarged Area A

P1.0.02 - Foundation Plumbing Plan - Enlarged Area B1

P1.0.03 - Foundation Plumbing Plan - Enlarged Area B2

P1.0.04 - Foundation Plumbing Plan - Enlarged Area D1

P1.0.05 - Foundation Plumbing Plan - Enlarged Area D2

P1.0.06 - Foundation Plumbing Plan - Enlarged Area F1

P1.0.07 - Foundation Plumbing Plan - Enlarged Area F2

P1.0.08 - Foundation Plumbing Plan - Enlarged Area E1

P1.0.09 - Foundation Plumbing Plan - Enlarged Area E2

P1.0.11 - Foundation Plumbing Plan - Enlarged Area C1

P1.0.12 - Foundation Plumbing Plan - Enlarged Area C2

P1.0.13 - Foundation Plumbing Plan - Enlarged Area G1

P1.0.14 - Foundation Plumbing Plan - Enlarged Area G2

P1.0.15 - Foundation Plumbing Plan - Enlarged Area G3 - Add Alt. Bid 1

P1.1.00 - Overall First Floor Fire Suppression Plan

P1.1.01 - First Floor Plumbing Plan - Enlarged Area A

P1.1.02 - First Floor Plumbing Plan - Enlarged Area B1

P1.1.03 - First Floor Plumbing Plan - Enlarged Area B2

P1.1.04 - First Floor Plumbing Plan - Enlarged Area D1

P1.1.05 - First Floor Plumbing Plan - Enlarged Area D2

P1.1.06 - First Floor Plumbing Plan - Enlarged Area F1

P1.1.07 - First Floor Plumbing Plan - Enlarged Area F2

P1.1.08 - First Floor Plumbing Plan - Enlarged Area E1

P1.1.09 - First Floor Plumbing Plan - Enlarged Area E2

P1.1.11 - First Floor Plumbing Plan - Enlarged Area C1

P1.1.12 - First Floor Plumbing Plan - Enlarged Area C2

P1.1.13 - First Floor Plumbing Plan - Enlarged Area G1

P1.1.14 - First Floor Plumbing Plan - Enlarged Area G2

P1.1.15 - First Floor Plumbing Plan - Enlarged Area G3 - Add Alt. Bids

P1.2.00 - Overall Second Floor Fire Suppression Plan

P1.2.01 - Second Floor Plumbing Plan - Enlarged Area A

P1.2.02 - Second Floor Plumbing Plan - Enlarged Area B1

P1.2.03 - Second Floor Plumbing Plan - Enlarged Area B2

P1.2.11 - Second Floor Plumbing Plan - Enlarged Area C1

P1.2.12 - Second Floor Plumbing Plan - Enlarged Area C2

P1.3.01 - First Floor Natural Gas and Lab Piping Plan - Enlarged Area A

P1.3.02 - First Floor Natural Gas and Lab Piping Plan - Enlarged Area B1

P1.3.03 - First Floor Natural Gas and Lab Piping Plan - Enlarged Area B2

P1.3.04 - First Floor Natural Gas and Lab Piping Plan - Enlarged Area D1

P1.3.05 - First Floor Natural Gas and Lab Piping Plan - Enlarged Area D2

P1.3.06 - First Floor Natural Gas Piping Plan - Enlarged Area F1

P1.3.07 - First Floor Natural Gas Piping Plan - Enlarged Area F2

P1.3.08 - First Floor Natural Gas Piping Plan - Enlarged Area E1

P1.3.09 - First Floor Natural Gas Piping Plan - Enlarged Area E2

P1.3.10 - First Floor Natural Gas Plan - Enlarged Area E3 - Deduct Alt Bid 1

P1.3.12 - First Floor Natural Gas Piping Plan - Enlarged Area C2

P1.3.13 - First Floor Natural Gas Piping Plan - Enlarged Area G1

P1.3.14 - First Floor Natural Gas Piping Plan - Enlarged Area G2

P1.4.01 - Second Floor Natural Gas and Lab Piping Plan - Enlarged Area A

P1.4.02 - Second Floor Natural Gas and Lab Piping Plan - Enlarged Area B1

P1.4.03 - Second Floor Natural Gas and Lab Piping Plan - Enlarged Area B2

P2.1.01 - Plumbing Notes, Symbols and Schedules

P3.1.01 - Plumbing Details

P5.1.01 - Enlarged Plumbing Plan - Partial Area 'A'

P5.1.02 - Enlarged Plumbing Plan - Area B1 Toilets

P5.1.03 - Enlarged Plumbing Plan - Partial Area 'F1'

P5.1.04 - Enlarged Plumbing Plan - Area C2 Toilets

 

 

10 Electrical

E0.1.00 - Symbols and General Notes - Electrical

E0.1.01 - Notes Related to Alternate Bid Electrical Work 

E1.1.01 - First Floor Plan - Enlarged Area 'A' - Lighting

E1.1.02 - First Floor Plan - Enlarged Area 'B1' -  Lighting

E1.1.03 - First Floor Plan - Enlarged Area 'B2' -  Lighting

E1.1.04 - First Floor Plan - Enlarged Area 'D1' -  Lighting

E1.1.05 - First Floor Plan - Enlarged Area 'D2' - Lighting

E1.1.06 - First Floor Plan - Enlarged Area 'F1' -  Lighting

E1.1.07 - First Floor Plan - Enlarged Area 'F2' -  Lighting

E1.1.08 - First Floor Plan - Enlarged Area 'E1' -  Lighting

E1.1.09 - First Floor Plan - Enlarged Area 'E2' - Base Bid -  Lighting

E1.1.10 - First Floor Plan - Enlarged Area 'E3' - Deduct Alt. Bid #1 -  Lighting

E1.1.11 - First Floor Plan - Enlarged Area 'C1' -  Lighting

E1.1.12 - First Floor Plan - Enlarged Area 'C2' -  Lighting

E1.1.13 - First Floor Plan - Enlarged Area 'G1' -  Lighting

E1.1.14 - First Floor Plan - Enlarged Area 'G2' - Base Bid -  Lighting

E1.1.15 - First Floor Plan - Enlarged Area 'G3' - Alt. Bid #1 -  Lighting

E1.1.16 - First Floor Plan - Enlarged Area 'G3' - Alt. Bid #2 & 3 -  Lighting

E1.2.01 - Second Floor Plan - Enlarged Area 'A' -  Lighting

E1.2.02 - Second Floor Plan - Enlarged Area 'B1' - Lighting

E1.2.03 - Second Floor Plan - Enlarged Area 'B2' -  Lighting

E1.2.04 - Mezzanine Plan - Enlarged Area 'D1' - Lighting

E1.2.06 - Second Floor Plan - Enlarged Area 'F1' -  Lighting

E1.2.11 - Second Floor Plan - Enlarged Area 'C1' -  Lighting

E1.2.12 - Second Floor Plan - Enlarged Area 'C2'-  Lighting

E1.3.15 - Control Room & Follow Spot -  Lighting

E2.1.01 - First Floor Plan - Enlarged Area A - Power

E2.1.02 - First Floor Plan - Enlarged Area B1 - Power

E2.1.03 - First Floor Plan - Enlarged Area B2 - Power

E2.1.04 - First Floor Plan - Enlarged Area D1 - Power

E2.1.05 - First Floor Plan - Enlarged Area D2' - Power

E2.1.06 - First Floor Plan - Enlarged Area F1 - Power

E2.1.07 - First Floor Plan - Enlarged Area F2 - Power

E2.1.08 - First Floor Plan - Enlarged Area E1 - Power

E2.1.09 - First Floor Plan - Enlarged Area E2 - Power

E2.1.10 - First Floor Plan - Enlarged Area E3 - Deduct Alt. Bid 1 - Power

E2.1.11 - First Floor Plan - Enlarged Area C1 - Power

E2.1.12 - First Floor Plan - Enlarged Area C2 - Power

E2.1.13 - First Floor Plan - Enlarged Area G1 - Power

E2.1.14 - First Floor Plan - Enlarged Area G2 - Power

E2.1.15 - First Floor Plan - Enlarged Area G3 - Alt. Bid - Power

E2.2.01 - Second Floor Plan - Enlarged Area A - Power

E2.2.02 - Second Floor Plan - Enlarged Area B1 - Power

E2.2.03 - Second Floor Plan - Enlarged Area B2 - Power

E2.2.06 - Second Floor Plan - Enlarged Area F1 - Power

E2.2.11 - Second Floor Plan - Enlarged Area C1 - Power

E2.2.12 - Second Floor Plan - Enlarged Area C2 - Power

E2.2.15 - Theatre Enlarged Plans G3 - Power

E2.3.01 - Large Scale Plan - Area D1 - Auto Shop Lab - Power

E2.3.02 - Large Scale Plan - Area D1 - Manufacturing Lab - Power

E2.3.03 - Large Scale Plan - Area D2 - Machine Shop - Power

E2.3.04 - Large Scale Plan - Area D2 - AG Lab - Power

E2.3.05 - Large Scale Plan - Area D2 - Construction Lab - Power

E2.3.06 - Large Scale Plan - Area F1 - Kitchen - Power

E2.4.01 - Rooftop Unit Plan - Enlarged Area D1 & D2 - Power

E2.4.02 - Rooftop Unit Plan - Power

E2.4.03 - Rooftop Unit Plan - Enlarged Area G2 - Power

E3.1.01 - First Floor Plan - Enlarged Area A - Special Systems

E3.1.02 - First Floor Plan - Enlarged Area B1 - Special Systems

E3.1.03 - First Floor Plan - Enlarged Area B2 - Special Systems

E3.1.04 - First Floor Plan - Enlarged Area D1 - Special Systems

E3.1.05 - First Floor Plan - Enlarged Area D2 - Special Systems

E3.1.06 - First Floor Plan - Enlarged Area F1 - Special Systems

E3.1.07 - First Floor Plan - Enlarged Area F2 - Special Systems

E3.1.08 - First Floor Plan - Enlarged Area E1 - Special Systems

E3.1.09 - First Floor Plan - Enlarged Area E2 - Special Systems

E3.1.10 - First Floor Plan - Enlarged Area E3 - Deduct Alt. Bid 1 - Special

E3.1.11 - First Floor Plan - Enlarged Area C1 - Special Systems

E3.1.12 - First Floor Plan - Enlarged Area C2 - Special Systems

E3.1.13 - First Floor Plan - Enlarged Area G1 - Special Systems

E3.1.14 - First Floor Plan - Enlarged Area G2 - Special Systems

E3.1.15 - First Floor Plan - Enlarged Area G3 - Special Systems

E3.2.01 - Second Floor Plan - Enlarged Area A - Special Systems

E3.2.02 - Second Floor Plan - Enlarged Area B1 - Special Systems

E3.2.03 - Second Floor Plan - Enlarged Area B2 - Special Systems

E3.2.06 - Second Floor Plan - Enlarged Area F1 - Special Systems

E3.2.11 - Second Floor Plan - Enlarged Area C1 - Special Systems

E3.2.12 - Second Floor Plan - Enlarged Area C2 - Special Systems

E3.2.15 - Theatre Enlarged Plans G3 - Special Systems

E4.1.00 - Details and Schematics

E4.1.01 - Details and Schematics

E4.1.02 - Details and Schematics

E5.1.00 - Panel Schedules

E5.1.01 - Panel Schedules

E5.1.02 - Panel Schedules

E5.1.03 - Panel Schedules

E5.1.04 - Panel Schedules

E5.1.05 - Panel Schedules

E6.1.00 - Electrical Riser Diagram, Contactor & Feeder Schedules

E6.1.01 - HVAC Schedule - Electrical

E7.1.00 - Light Fixture Schedule

ES0.1.01 - Electrical Site Plan - Lighting

ES0.1.02 - Electrical Site Plan - Football Field - Lighting

 

 

12 Food Service

11 40 00-02-01 Reviewed 2015-3-2 Food Service Equipment Rough-In Drawings Submittal 10-1127.03

FS-1 - Food Service Equipment Plan

FS-2 - Plumbing Connection Plan

FS-3 - Plumbing-Gas Connection Schedule

FS-4 - Electrical Connection Plan

FS-5 - Electrical Connection Schedule

 

 

13 Theater

TP1.1.01 - Stage Platforms - Orchestra Pit Platform Details

TP1.1.02 - Stage Platforms - Orchestra Pit Platform Details

TR1.1.01 - Stage Rigging - Linesets Plan

TR1.1.03 - Stage Rigging - Acoustical Drapes and Houselight Rigging Plan

TR2.1.01 - Stage Rigging Longitudinal Sections

TR2.1.03 - Stage Rigging - Schedules

TR3.1.01 - Stage Rigging - Transverse Section - Main Curtain

TR3.1.02 - Stage Rigging - Transverse Section - Typical Lineset with Dropbox

TR3.1.03 - Stage Rigging - Transverse Section - First Electric

TR3.1.04 - Stage Rigging - Transverse Section - Typical Electric

TR3.1.05 - Stage Rigging - Transverse Section - Orchestra Shell Ceiling #1

TR3.1.06 - Stage Rigging - Transverse Section - Orchestra Shell Ceiling #2

TR3.1.07 - Stage Rigging - Transverse Section - Midstage and Upstage Travelers

TR3.1.10 - Stage Rigging - Elevation - Rear Wall Acoustical Curtains

TR3.1.11 - Stage Rigging - Elevation - Houselight Maintenance Track D1 Through D8

TR3.1.12 - Stage Rigging - Elevation - Houselight Maintenance Tracks D9 and D10

TR3.1.8 - Stage Rigging - Transverse Section - Torm Panels

TR3.1.9 - Stage Rigging - Elevation - Front of House Acoustical Curtains

TR4.1.1 - Stage Rigging - Details

TR4.1.2 - Stage Rigging - Details

TR4.1.3 - Stage Rigging - Details

TR4.1.4 - Stage Rigging - Details

TR4.1.5 - Stage Rigging - Details

TS1.1.01 - Auditorium Seating Layout

TS1.1.02 - Auditorium Seating Layout - Tablet Arm Layout

 

 

14 Theater Electrical

TE1.1.01 - Dimming System - Faceplate Details

TE1.1.02 - Dimming System - Faceplate Details

TE1.1.03 - Dimming System - Faceplate Details

TE1.1.04 - Dimming System - Faceplate Details

TE2.1.1 - Dimming System - Architectural Coordination

TE2.1.2 - Dimming System - Architectural Coordination

TE2.1.3 - Dimming System - Architectural Coordination

TE2.1.4 - Dimming System - Architectural Coordination

TE2.1.5 - Dimming System - Architectural Coordination

TE3.1.1 - Dimming System - Rigging Coordination

TE3.1.2 - Dimming System - Rigging Coordination

TE3.1.3 - Dimming System - Rigging Coordination

TE3.1.4 - Dimming System - Rigging Coordination

TE3.1.5 - Dimming System - Rigging Coordination

TE3.1.6 - Dimming System - Rigging Coordination

TE4.0.1 - Stage Dimming System Legend

TE4.0.2 - Stage Dimming System Lighting Fixture Schedule

TE4.2.1 - Auditorium Lighting Layout - Level 1

TE4.2.2 - Auditorium Lighting Layout RCP - Level 1

TE4.2.3 - Auditorium Panel Layout - Level 1

TE4.2.4 - Auditorium Power Layout - Level 1

TE4.3.1 - Auditorium Lighting Layout - Level 2

TE4.3.2 - Auditorium Lighting Layout RCP - Level 2

TE4.3.3 - Auditorium Panel Layout - Level 2

TE4.4.1 - Auditorium Lighting Layout - Catwalk and Loading Gallery Levels

TE4.4.2 - Auditorium Lighting Layout RCP - Catwalk and Loading Gallery Levels

TE4.4.3 - Auditorium Panel Layout - Catwalk and Loading Gallery Levels

TEO.1.01 - Dimming System - One-Line Diagram

TEO.1.02 - Dimming System - Schedules

TEO.1.03 - Dimming System - Schedules

 

15 Acoustical

EA1.0.00 - Electrical for Audio Details and Legends

EA1.0.01 - Electrical for Audio - Termination Schedule

EA1.1.07 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'F2'

EA1.1.08 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'E1'

EA1.1.09 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'E2' - Base Bid

EA1.1.12 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'C2'

EA1.1.13 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'G1'

EA1.1.14 - Electrical for Audio - First Floor Note Plan - Enlarged Area 'G2'

EA1.2.15 - Electrical for Audio - Second Floor Note Plan - Enlarged Area 'G2'

 

 

16 Fire Protection

FP1.1.00 - Overall First Floor Fire Suppression Plan

FP1.2.00 - Overall Second Floor Fire Suppression Plan